This electric vehicle charging station project is a superior unit of the Chongqing Health Information Center - Chongqing Population and Family Development Research Center. The project was initiated by the Chongqing Population and Family Development Research Center and provided a free venue by the unit. It is located at No. 420 Baohuan Road Health Information Center and covers an area of approximately 200 square meters.
Construct 12 charging parking spaces, equipped with 120kW DC all-in-one machines for charging 6 guns for small cars, 160kW DC all-in-one machines for charging 6 guns for large cars, equipped with a transformer capacity of 1000kVA, and supporting relevant distribution facilities. The power supply is set up from the high-voltage pole across the road. The project adopts the standard construction of electric vehicle charging stations. The fast charging station covers an area of about 200 square meters, with 3 120KW charging piles (1 pile and 2 guns) for small vehicles to charge, and 3 160KW charging piles (1 pile and 2 guns) for large vehicles to charge. After completion, it can simultaneously charge 12 vehicles.
After the completion of this project, the card will be charged first and then charged, with no one on duty. Due to the fact that this project is located on the roadside, it is possible for gasoline vehicles to occupy space and park, which may affect the charging efficiency of electric vehicles. Therefore, a special design has been made to only recognize the automatic release of the new energy electric vehicle ground lock for charging.